construction project

Home / customershow

Airport construction project

_

Beijing Daxing International Airport

Cooperation time:

2015-2019

Cooperative unit:

Beijing Construction Engineering Group Co., Ltd.

Material supply:

H beam,I beam,Angle steel,U channel

_

Beijing Daxing International Airport is a super-large international aviation comprehensive transportation hub. The airport's main project covers an area of 700,000 square meters of terminal building, with 92 passenger planes close to seats. When the passenger flow reached 45 million, the terminal building of Daxing International Airport was completed and accepted on June 30, 2019.

High-speed Railway construction project

_

Beijing-Tianjin Intercity Railway

Cooperation time:

2015-2016

Cooperative unit:

China Railway Eighteenth Bureau Group Co., Ltd.

Material supply:

Flat bar,Rebar,I beam,H beam

_

The Beijing-Tianjin Intercity Railway is an intercity railway connecting Beijing and Tianjin. It is an important part of the Intercity Rail Transit Network in the Bohai Rim Region in China's "Medium and Long-term Railway Network Planning" and is also included in the "Medium and Long-term Railway Network Planning". The first intercity passenger transport system to be opened and operated.

Flood Control Project

_

Philippine Flood Control Project

Cooperation time:

2018-2019

Cooperative unit:

Philippine

Material supply:

Steel sheet pile,Seamless pipe

_

The project overcomes a series of problems such as the difficulty of excavation and embankment construction caused by the difficulty of excavation and embankment construction due to the low foundation bearing capacity and high groundwater level, and the construction equipment cannot work normally on this soft foundation. The project was successfully completed, and the building materials and steel required for the project played a major supporting role.

Power plant construction project

_

Bangladesh Power Plant Project

Cooperation time:

2018-2019

Cooperative unit:

Bangladesh

Material supply:

Round bar,U channel,H beam,I beam

_

Bangladesh is an important country along the Maritime Silk Road. In recent years, the economic development momentum has been good, with an average annual GDP growth rate of over 6%, and a large gap between power supply and demand. The country's thermal power generation accounts for 97.35% of the total power generation. Steel and building materials from China provide sufficient material support for the construction of power plants.

Highway construction project

_

Suifenhe-Manzhouli Highway

Cooperation time:

2018-2019

Cooperative unit:

China Railway Eighteenth Bureau Group Co., Ltd.

Material supply:

Rebar,Structure steel

_

This project is of special significance for promoting the movement of people in eastern MongguProvince and accelerating economic development. It is expected that after the completion of this line, the time from Manzhouli to Harbin can be significantly reduced from 12 and a half hours in 2014 to less than 6 hours. With the Beijing-Harbin high-speed rail Opened, it can be compressed to less than 13 hours.

We will get you a fast free quote and schedule your job on the day and time that works best for you.

subscription